Monday 26 December 2011

Project 11 : Mounting An Exhibition (Scale)

My portfolio to put all my work inside :) the male and female sign works as a key and lock ^^
This is my A1 board that include all the projects done since I enter HBP ^^

Project 10 : (G) Community Facility (View)








Project 9 : (G) Integrated Project (Angle)

The Concept of Pavilion
 The location of the Iconusm

The model of Iconusm

Saturday 12 November 2011

Project 8 : Object Connection (Jointing)

This is the puzzle to be connected to the BIG puzzle in below..

Project 7 : (G) Analysis of GTWH Building (Presentation)


Final Product Of analysis of George Town World Heritage
Buildings
Suffolk House
Standard Chartered Building

Eastern & Oriental Hotel
The Symbolic icon that i draw Based on Standard Chartered Building



Picture of Standard Chartered Building 


My Drawing of  Standard Chartered Building















Tuesday 18 October 2011

Project 5 : The Mask (Speculative)



The materials needed to make a mask.












I'll let the Mask dry for itself after taking off wetly :)
















I painted the mask with skin colour :)

Started to draw eyebrows and expression of the mask.
















Final product.The mask itself bring the feeling of sadness even without the eyebrows, mouth and tears. So, I decided not to over-do the mask as it already serve its purposes. This expression of this mask is shown when i enter the room of the negative part of the society nowadays :(

Friday 30 September 2011

Project 3A : Black Box (Pictorial)

Top View












           
Side View





                   













Front View














Plan